Case Studies

Municipal Wastewater Treatment Success Stories

The Ydro Process® has been successfully implemented in multiple municipal wastewater treatment plants around the world. These real-life case studies demonstrate how municipalities benefit from reduced sludge production, improved process stability, and significant operational savings — all without major investments or system overhauls.

Norway, Mongstad

CASE STUDY 1: OIL INDUSTRY

Case Study Oil Industry
Location Norway, Mongstad
Target Sludge Elimination
Population Equivalent 100000
Flowrate 500 m3/day
Treated Wastewater Industrial – Oil
Project Initiation 12/2023

CASE STUDY: SHYMKENT W.W.T.P.

Case Study Shymkent W.W.T.P.
Location Kazakhstan
Target Sludge Elimination
Population Equivalent 1000000
Flowrate 150000 m3/day
Treated Wastewater Municipal
Project Initiation 07/01/2024
SHYMKENT
astana

CASE STUDY: ASTANA

Case Study Astana
Location Kazakhstan
Characteristics Data
Type of Treatment Plant Classic
Project capacity 254000 m3/day
330000 (actual)
Incoming flow per day to the WWTP (average) 265000 - 275000m3/day
Excess sewage sludge (humidity 75%, 2024) 240-250 tons/day
MARIJAMPOLE

CASE STUDY: MARIJAMPOLE W.W.T.P.

Case Study Marijampole W.W.T.P.
Location Lithuania
Target Sludge Elimination, Odour Control
Populations Equivalent 100000
Flowrate 12500 m3/day
Treated Wastewater Municipal
Project Initiation 08/2022

CASE STUDY: ANDRATX W.W.T.P.

Case Study Andratx W.W.T.P.
Location Mallorca, Spain
Target Sludge & Energy Reduction
Populations Equivalent 20000
Flowrate 2500 m3/day
Treated Wastewater Municipal
ANDRATX

CASE STUDY: DRUSKININKAI W.W.T.P

Case Study Druskininkai W.W.T.P.
Location Southern Lithuania
Target Sludge & Odour Elimination
Population Equivalent 15000
Flowrate 4600 m3/day
Treated Wastewater Municipal
Cart (0 items)